Sunday 20 July 2008

Latest update 20th July 2008

I have added a link to my new Fotopic Gallery for the layout, click on the image on the right hand side to be taken there.

Tuesday 15 July 2008

15th July 2008

I have uploaded a free hit counter and a couple new links onto this blog.

Sunday 13 July 2008

13 July 2008

I have uploaded a photo showing the general station area, buildings and road vehicles are in place temporarily to give an idea of the finished thing.

Wednesday 9 July 2008

The begininng

Work on Jochberg, my second Austrian Narrow gauge Layout, was started over the May bank holiday weekend 2008 (5.5.08) and has progressed steadily and is now at the stage where all baseboards are built, all track work is in place and with the exception of a couple of isolating sections on the shed road, the wiring is all done.

The magnets for the remote uncoupling are in place and the track work has been sprayed and weathered with the airbrush.

With the basic buildings temporally in place it's now time to give the layout a good test run. This will involve running the layout as if it was being exhibited with all the required stock on the layout and all the various movements tried. This will hopefully highlight any possible operating glitches and ensure all the stock is in good working order.

Well that's it for now, time to go work on the layout, more news soon and hopefully some photo's.